Two-stage Assembly Flowshop Scheduling Problem With Bi-objective of Number of Tardy and Makespan Minimization

Javad Navaei, Ashkan Mozdgir, Hooman Hidaji. Two-stage Assembly Flowshop Scheduling Problem With Bi-objective of Number of Tardy and Makespan Minimization. In Hamid R. Arabnia, David de la Fuente, Elena B. Kozerenko, José Angel Olivas, Rui Chang, Peter M. LaMonica, Raymond A. Liuzzi, Ashu M. G. Solo, editors, Proceedings of the 2010 International Conference on Artificial Intelligence, ICAI 2010, July 12-15, 2010, Las Vegas Nevada, USA, 2 Volumes. pages 704-709, CSREA Press, 2010.

@inproceedings{NavaeiMH10,
  title = {Two-stage Assembly Flowshop Scheduling Problem With Bi-objective of Number of Tardy and Makespan Minimization},
  author = {Javad Navaei and Ashkan Mozdgir and Hooman Hidaji},
  year = {2010},
  researchr = {https://researchr.org/publication/NavaeiMH10},
  cites = {0},
  citedby = {0},
  pages = {704-709},
  booktitle = {Proceedings of the 2010 International Conference on Artificial Intelligence, ICAI 2010, July 12-15, 2010, Las Vegas Nevada, USA, 2 Volumes},
  editor = {Hamid R. Arabnia and David de la Fuente and Elena B. Kozerenko and José Angel Olivas and Rui Chang and Peter M. LaMonica and Raymond A. Liuzzi and Ashu M. G. Solo},
  publisher = {CSREA Press},
  isbn = {1-60132-148-1},
}