Managing concurrent engineering with early supplier involvement: a case study

K. Rouibah, K. R. Caskey. Managing concurrent engineering with early supplier involvement: a case study. Int. J. Computer Integrated Manufacturing, 18(6):509-521, 2005. [doi]

Abstract

Abstract is missing.