A Two-Phase Heuristic for the Production Scheduling of Heavy Plates in Steel Industry

Lixin Tang, Xianpeng Wang. A Two-Phase Heuristic for the Production Scheduling of Heavy Plates in Steel Industry. IEEE Trans. Contr. Sys. Techn., 18(1):104-117, 2010. [doi]

Authors

Lixin Tang

This author has not been identified. Look up 'Lixin Tang' in Google

Xianpeng Wang

This author has not been identified. Look up 'Xianpeng Wang' in Google