A Two-Phase Heuristic for the Production Scheduling of Heavy Plates in Steel Industry

Lixin Tang, Xianpeng Wang. A Two-Phase Heuristic for the Production Scheduling of Heavy Plates in Steel Industry. IEEE Trans. Contr. Sys. Techn., 18(1):104-117, 2010. [doi]

@article{TangW10-5,
  title = {A Two-Phase Heuristic for the Production Scheduling of Heavy Plates in Steel Industry},
  author = {Lixin Tang and Xianpeng Wang},
  year = {2010},
  doi = {10.1109/TCST.2009.2014960},
  url = {http://dx.doi.org/10.1109/TCST.2009.2014960},
  researchr = {https://researchr.org/publication/TangW10-5},
  cites = {0},
  citedby = {0},
  journal = {IEEE Trans. Contr. Sys. Techn.},
  volume = {18},
  number = {1},
  pages = {104-117},
}