A robust production control policy for a multiple-stage production system with inventory inaccuracy and time-delay

Zheng Wang, Felix T. S. Chan. A robust production control policy for a multiple-stage production system with inventory inaccuracy and time-delay. In 2013 IEEE International Conference on Automation Science and Engineering, CASE 2013, Madison, WI, USA, August 17-20, 2013. pages 77-82, IEEE, 2013. [doi]

Abstract

Abstract is missing.