1 | -- | 15 | Roger L. Tobin. A fast interactive solution method for large capital expenditure selection problems |
16 | -- | 32 | Guoqiang Zhang, Michael Y. Hu, B. Eddy Patuwo, Daniel C. Indro. Artificial neural networks in bankruptcy prediction: General framework and cross-validation analysis |
33 | -- | 50 | Wlodzimierz Ogryczak, Andrzej Ruszczynski. From stochastic dominance to mean-risk models: Semideviations as risk measures |
51 | -- | 68 | Mikael Rönnqvist, Suda Tragantalerngsak, John Holt. A repeated matching heuristic for the single-source capacitated facility location problem |
69 | -- | 79 | Zvi Drezner, Jeffery Guyse. Application of decision analysis techniques to the Weber facility location problem |
80 | -- | 86 | María José Canós, Carlos Ivorra, Vicente Liern. An exact algorithm for the fuzzy p-median problem |
87 | -- | 99 | Dilek Tuzun, Laura I. Burke. A two-phase tabu search approach to the location routing problem |
100 | -- | 117 | Lie-Chien Lin, Gunter P. Sharp. Quantitative and qualitative indices for the plant layout evaluation problem |
118 | -- | 138 | Lie-Chien Lin, Gunter P. Sharp. Application of the integrated framework for the plant layout evaluation problem |
139 | -- | 155 | Michael Vineyard, Kwasi Amoako-Gyampah, Jack R. Meredith. Failure rate distributions for flexible manufacturing systems: An empirical study |
156 | -- | 170 | Chandrasekharan Rajendran, Oliver Holthaus. A comparative study of dispatching rules in dynamic flowshops and jobshops |
171 | -- | 182 | Zubair M. Mohamed, Ashok Kumar, Jaideep Motwani. An improved part grouping model for minimizing makespan in FMS |
183 | -- | 193 | Bertrand M. T. Lin, T. C. Edwin Cheng. Minimizing the weighted number of tardy jobs and maximum tardiness in relocation problem with due date constraints |
194 | -- | 204 | Erdal Erel, Hadi Gökçen. Shortest-route formulation of mixed-model assembly line balancing problem |
205 | -- | 219 | Eugeniusz Nowicki. The permutation flow shop with buffers: A tabu search approach |
220 | -- | 232 | Zhi-Long Chen, Warren B. Powell. A column generation based decomposition algorithm for a parallel machine just-in-time scheduling problem |
233 | -- | 234 | R. Jonker, A. Volgenant. Linear assignment procedures |