Journal: Int. J. Prod. Res.

Volume 60, Issue 3

847 -- 865Kai Wang, Fugee Tsung. Bayesian cross-product quality control via transfer learning
866 -- 893Frederik Ferid Ostermeier. On the trade-offs between scheduling objectives for unpaced mixed-model assembly lines
894 -- 911Haoxun Chen, Bo Dai, Yuan Li, Yidong Zhang, Xiaoqing Wang, Yuming Deng. S) policies
912 -- 941Jabir E., Vinay V. Panicker, Rajagopalan Sridharan. Environmental friendly route design for a milk collection problem: the case of an Indian dairy
942 -- 956Sihan Huang, Guoxin Wang 0001, Yan Yan 0008. Building blocks for digital twin of reconfigurable machine tools from design perspective
957 -- 976Xing Wan, Xingquan Zuo, Xiaodong Li, Xinchao Zhao. A hybrid multiobjective GRASP for a multi-row facility layout problem with extra clearances
977 -- 998Xiuyi Zhang, Wenhua Hou, Wenqing Zhang. Simultaneous or sequential? Multihoming launch strategies for mobile applications with consideration of promotion and switching costs
999 -- 1015Stephan Dreyer, Andreas Egger, Louis Christian Püschel, Maximilian Röglinger. Prioritising smart factory investments - A project portfolio selection approach
1016 -- 1035Zhengmin Zhang, Zailin Guan, Yeming Gong, Dan Luo, Lei Yue. Improved multi-fidelity simulation-based optimisation: application in a digital twin shop floor
1036 -- 1050Matthias Thürer, Nuno O. Fernandes, Mark Stevenson. Production planning and control in multi-stage assembly systems: an assessment of Kanban, MRP, OPT (DBR) and DDMRP by simulation
1051 -- 1068Yipei Zhang, Ada Che, Feng Chu. Improved model and efficient method for bi-objective closed-loop food supply chain problem with returnable transport items
1069 -- 1085Iracyanne Retto Uhlmann, Renata Mariani Zanella, Enzo Morosini Frazzon. Hybrid flow shop rescheduling for contract manufacturing services
1086 -- 1104Yunxia Han, Yiliu Tu, Linhan Ouyang, Jianjun Wang 0005, Yizhong Ma. Economic quality design under model uncertainty in micro-drilling manufacturing process
1105 -- 1133Antonio Costa 0001, Salvatore Cannella, Roberto R. Corsini, Jose M. Framiñan, Sergio Fichera. Exploring a two-product unreliable manufacturing system as a capacity constraint for a two-echelon supply chain dynamic problem